Customization: | Available |
---|---|
After-sales Service: | 24-Hour Online After-Sales Service |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical Parameters | ||
---|---|---|
Category | Item | Parameter or Configuration |
Vehicle - wide Parameters | Product Model | KLF5080TXSQ6 |
Dimensions [Length×Width×Height (mm)] | 7100×2200; 2250×2760 | |
Kerb Mass (kg) | 7000, 7200 | |
Maximum Total Mass (kg) | 8280 | |
Rated Load Capacity (kg) | 1150, 1085 | |
Maximum Driving Speed (km/h) | 105 | |
Rated Number of Passengers | 2; 3 persons | |
Chassis Parameters | Engine Model | 4KH1CN6HB/4KH1CN6LB National VI Emission Standard, Diesel Engine |
Category, Manufacturer | Q-ingling Motors Co., Ltd. | |
Engine Power (kW) | 97/88 | |
Wheelbase (mm) | 3815 | |
Tires | 7.50R16LT 14PR | |
Front Overhang / Rear Overhang (mm) | 1120/2165 | |
Braking Type | Exhaust Braking | |
Number of Spring Leaves | 6/6 + 6 | |
Transmission Model | 1suzu 5 - speed; 1suzu 6 - speed | |
Number of Tires | 6+1 | |
Chassis Model | QL1080BUKACY |
Category | Item | Parameter or Configuration |
---|---|---|
Special Parameters | Sub - engine Model | B140, Dongfeng Cummins Engine Co., Ltd. |
Engine Power (kW) | 103 | |
Fuel Type | 0 - grade light diesel oil (shared with the chassis fuel tank) | |
Refuse Bin Volume (m³) | 5 (304 stainless steel) | |
Fresh Water Tank Volume (m³) | 4 (carbon steel with anti - corrosion treatment; stainless steel is optional) | |
Sweeping Width (mm) | 2800 - 3000 | |
Sweeping Operation Speed (km/h) | 3 - 20 | |
Cleaning Operation Speed (km/h) | 15 - 20 | |
Maximum Sweeping Capacity (m²/h) | 60000 | |
Suction Particle Size (mm) | ≥100 | |
Tipping Angle of Refuse Bin | ≥45° | |
Sweeping Efficiency | ≥96% | |
Main Components of Dust Suppression System | Water filter, pipeline, stainless - steel spray frame, high - pressure nozzles, etc. | |
High - pressure Water Pump | Well - known brand | |
Control Mode of Dust Suppression System | Electronic control, one - key operation | |
Planetary Cycloid Gear Motor | Sanyo Machinery | |
Gear Oil Pump | Wanye Machinery | |
Hydraulic Cylinder | Wissenborg Hydraulic Cylinder | |
Hydraulic Oil Pipe | Guangzhou Tianhe | |
Solenoid Valve Group | Wissenborg (Sino - German joint venture) |
Category | Item | Parameter or Configuration |
---|---|---|
Special Parameters Chassis Parameters |
Overflow Pressure of Hydraulic System (Mpa) | 10 - 15 |
Volume of Hydraulic Oil Tank (L) | ≥60 | |
Electrical System | Composed of chassis circuits, sub - generator electrical parts, and operation control circuits for special work devices | |
Composition of the Electric Control Box Panel | Sub - engine tachometer, sub - engine water temperature gauge, oil temperature alarm device, various operation control switches | |
Fan Brand | High - end customized high - power maintenance - free centrifugal fan, optional (Luoyang Beibo maintenance - free centrifugal fan) | |
Rated Rotational Speed of Fan (r/min) | 2700 | |
Transmission Form | From sub - engine to automatic clutch, then to fan and high - pressure water pump | |
Fan Belt | Zhejiang Sanlisi | |
Automatic Clutch | Changsun clutch, with a service life of up to 20,000 working hours | |
Air Volume (m³/h) | 5000 - 7800 | |
Composition of Sweeping System | Sweeping disc bracket, sweeping disc, oil cylinder, oil pipe, connecting rod, adjusting rod, hydraulic motor, etc. | |
Opening Diameter of Sweeping Brush (mm) | ∅800 - 900 | |
Rotational Speed of Sweeping Disc Motor (r/min) | 140 | |
Number of Sweeping Discs | 2 | |
Number of Sweeping Brushes per Sweeping Disc | 22 | |
Inclination Adjustment of Front Sweeping Disc | Forward inclination 5° - 15°, backward inclination 5° - 10° | |
Inclination Adjustment of Rear Sweeping Disc | Forward inclination 5° - 10°, backward inclination 5° - 10° | |
Diameter of Suction Pipe (mm) | ∅180 | |
Clearance from the Ground of the Rigid Part of the Suction Nozzle Edge in Working State (mm) | 5 - 8 | |
Alarm System | Reverse voice alarm system | |
Sub - operation System | Tail electric - controlled operation system, controlling the lifting of the large box and the opening and closing of the rear door |
cleaning and sweeping vehicle is an efficient sanitation vehicle that integrates the functions of a road sweeping vehicle and a high-pressure cleaning vehicle. The vehicle adopts Dongfeng Tianjin second-class chassis and is equipped with a secondary engine and its transmission device, garbage bin, clean water tank, cleaning device, dust reduction system, suction nozzle, low-pressure flushing system, high-pressure cleaning system, hydraulic system, pneumatic system, electrical system and other components.
Hot New Or Used Large Dongfeng Street Sweeper Heavy-duty Diesel 18000KG Road Cleaning and Sweeping Vehicle 8CBM Washing Sweep and Suck Truck 5180
This car has diverse functions, beautiful and elegant appearance, and superior performance that is efficient, environmentally friendly, and reliable.
matters needing attention:
1. For the running in mileage of the car chassis, please refer to the accompanying car chassis user manual for running in and maintenance after running in, such as cleaning the air filter element and replacing the engine oil. running-in
During this period, pay attention to checking for any abnormal vibration, noise, and water leakage in each part, whether the fan drive belt and hydraulic pump drive belt are slipping, and whether the electronic control switches and instrument indicators are normal.
2. Before using the vehicle, it is necessary to check for any oil, water, or gas leaks in the entire vehicle, and if necessary, eliminate them. Check the oil level of the main and auxiliary engines, the water level of the radiator, and if necessary, add oil and water. Check the water system
Are the structural components such as scanning disks and suction cups functioning properly.
3. In winter, before stopping the vehicle, follow the product manual to carry out waterproof and antifreeze operations, and drain the remaining water in the water circuit, water pump, water valve, nozzle and other components.
4. When the engine is running, maintenance or repair of the chassis auxiliary engine, water pump, and hydraulic system is not allowed.
5. When cleaning the vehicle, do not use high-pressure water to directly flush the top of the hydraulic oil tank, auxiliary engine, radiator, solenoid valve, coil, and terminal parts.
To ensure the safety of operators and equipment, the safety pole under the garbage bin must be opened during debugging, installation, testing, and maintenance operations. And secure the safety pole with a safety pin to ensure that personnel and equipment are in contact
Be prepared for safety. Before resetting the trash can after homework, the safety pole should be lowered first.
Q1. Is your company a factory or a trading company?
A: We are a leading manufacturer of special trucks, tank trucks, trailers, and spare parts in China. Welcome to visit our special vehicle production base in Suizhou City, China.
Q2. What are your payment terms?
A: T/T 30-50% as deposit, the rest to be paid before delivery. We will show you photos of the products and packages before you pay the balance.
Q3. What are your delivery terms?
A: EXW, FOB, CFR, CIF, DAF, DDU.
Q4. How about your delivery time?
A: Generally, it takes 20 to 30 days after receiving the advance payment. The specific delivery time depends on the items and quantity of the order.
Q5. Can you customize the products to meet my requirements?
A: Yes. We have a professional R&D team, and we can produce products exactly as you require.
Q6. What is the price of your products?
A: We are factory direct sales, so the price is very competitive. Different products have different prices. The price
also depends on your special needs. To know the exact price, please contact us!
Q7. Do you test all the goods before delivery?
A: Yes, we do 100% testing before delivery.
Q8. What service can I get from you?
A: We provide lifetime tracking service and a one-year free warranty for all our products.